BESS & Solar Inverter Monitoring — full dashboard
Simulated hybrid plant: 11 MWh of storage across three banks, 18 PV inverters rated 100–125 kW and 90 DC strings. The simulated clock runs 120× faster than real time.
Conditions driving irradiance, panel derating and charging demand
- Cloud cover
- 29 %
- Wind
- 15 km/h
- Humidity
- 69 %
- PV potential
- 1681 kW
- 14:0025°1.7M
- 15:0025°1.5M
- 16:0024°919
- 17:0023°668
- 18:0022°636
- 19:0022°539
- 20:0021°223
- 21:0019°0
Single-line diagram with live power on every branch. Animation direction follows the actual direction of energy.
3 MWh · 1.5 MW · LFP 1P416S
- Power
- 360 kW
- Available
- 2.02 MWh
- SOH
- 98.2 %
- Cycles
- 412
- Cell temp.
- 26.0 °C
- C-rate
- 0.12 C
3 MWh · 1.5 MW · LFP 1P416S
- Power
- 234 kW
- Available
- 1.63 MWh
- SOH
- 96.4 %
- Cycles
- 688
- Cell temp.
- 28.1 °C
- C-rate
- 0.08 C
5 MWh · 2.5 MW · LFP 2P416S
- Power
- 703 kW
- Available
- 3.67 MWh
- SOH
- 99.1 %
- Cycles
- 214
- Cell temp.
- 29.7 °C
- C-rate
- 0.14 C
Generation, load, battery power and grid exchange over the simulated day. The vertical marker shows the current moment.
- PV generation
- Site load
- EV charging
- Battery (+ discharge / − charge)
- Grid (+ import / − export)
- State of charge
500 kW import connection and 750 kW export limit, metered hour by hour at the interconnection point
- Import
- Export
- Imported today
- 1.90 MWh Peak 500 kW · of 500 kW
- Exported today
- 0.00 MWh Peak 24 kW · of 750 kW
- Net balance
- -1.89 MWh Busiest hour in 448 kWh · out 617 kWh
- Peak shaved by BESS
- 4 kWh Battery covers demand above the 500 kW import cap
18 string inverters rated 100–125 kW, grouped into three blocks. The bar under each card shows load against nameplate rating, the segments below show per-string health.