Home / Articles / Practical notes: Prompt, context, harness, loop: the four layers of engineering

This article is published in English.

Practical notes: Prompt, context, harness, loop: the four layers of engineering

Operable walkthrough of Practical notes: Prompt, context, harness, loop: the four layers of engineering: contracts, checks, and drop-in code slots for teams shipping this pattern.

2135 words

Use this as an operator-facing rebuild of the ideas in “Prompt, context, harness, loop: the four layers of engineering an AI agent”: clear stages, ordered code slots, and recovery notes that survive a handoff. The Overview stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Document the happy path and the recovery path together. Retries, human gates, and dead-letter handling are part of the product, not later polish.

Layer 1: Prompt engineering (what you say)

For the Layer 1 Prompt engineering stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Prefer small, testable units over sprawling scripts. When a step fails, the failure should point at a single responsibility rather than a tangled pipeline. Prefer structured outputs with schema validation over free-form prose when the next step is code or a tool call.

Look at this GitHub issue and label it.
You are a triage agent for project X. For each issue, output JSON with:
  component  (one of the values in the taxonomy provided in context)
  severity   (critical | high | medium | low)
  team       (the owning team from the on-call table provided in context)
Base severity only on user-facing impact stated in the issue, not on your
own guess about difficulty. If the component is ambiguous, set
"component": "unknown" rather than guessing.

Layer 2: Context engineering (what the model knows)

For the Layer 2 Context engineering stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Treat this stage as a contract between inputs and validated outputs. Name the artifacts, define success checks, and refuse silent partial completion. Prefer structured outputs with schema validation over free-form prose when the next step is code or a tool call.

Layer 3: Harness engineering (what the model can do)

For the Layer 3 Harness engineering stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Record timings and token or query cost next to functional results. Cost visibility early prevents surprise bills when the path moves from demo to shared environments. Prefer structured outputs with schema validation over free-form prose when the next step is code or a tool call. For the Layer 3 Harness engineering stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Document the happy path and the recovery path together. Retries, human gates, and dead-letter handling are part of the product, not later polish.

{
  "name": "apply_label",
  "description": "Apply a label to a GitHub issue. Only use after reading the issue body and checking the component taxonomy.",
  "parameters": {
    "type": "object",
    "properties": {
      "issue_number": { "type": "integer" },
      "labels": { "type": "array", "items": { "type": "string" } }
    },
    "required": ["issue_number", "labels"]
  }
}

Layer 4: Loop engineering (what makes it an agent)

When working through the Layer 4 Loop engineering stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Prefer small, testable units over sprawling scripts. When a step fails, the failure should point at a single responsibility rather than a tangled pipeline. Cache stable system instructions and tool schemas. Re-sending identical preamble is a common source of burn.

def agent_loop(goal, max_iterations=10):
    context = gather_initial_context(goal)
    consecutive_errors = 0
    for i in range(max_iterations):
        action = model.decide(context, goal)
        if action.type == "done":
            return action.result
        result = execute(action)
        if result.error:
            consecutive_errors += 1
            if consecutive_errors >= 3:
                # stuck: same approach keeps failing, decompose differently
                context.add("Previous approach failed 3 times. Try a different strategy.")
                consecutive_errors = 0
        else:
            consecutive_errors = 0
        context.add(result)
    return escalate_to_human(context)

One agent, four layers: GitHub issue triage

When working through the One agent four layers stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Treat this stage as a contract between inputs and validated outputs. Name the artifacts, define success checks, and refuse silent partial completion. Cache stable system instructions and tool schemas. Re-sending identical preamble is a common source of burn.

Where this vocabulary came from

When working through the Where this vocabulary came stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Record timings and token or query cost next to functional results. Cost visibility early prevents surprise bills when the path moves from demo to shared environments. Cache stable system instructions and tool schemas. Re-sending identical preamble is a common source of burn. When working through the Where this vocabulary came stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Document the happy path and the recovery path together. Retries, human gates, and dead-letter handling are part of the product, not later polish.

Where to invest first

The Where to invest first stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Prefer small, testable units over sprawling scripts. When a step fails, the failure should point at a single responsibility rather than a tangled pipeline. Budget tokens per turn and per session. Agentic tools expand context aggressively; hard caps keep demos from becoming surprise invoices.

Operational checklist

When working through the Operational checklist stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest.

Keep configuration outside application code. Environment files, secret stores, and feature flags belong in one place operators can audit without reading the whole graph.

Cache stable system instructions and tool schemas. Re-sending identical preamble is a common source of burn.

Expose tools with narrow schemas and explicit side-effect labels. Hosts need to know which calls mutate state before they auto-approve.

Put human approval on edges that spend money or change production data. Compile-time wiring does not equal business completeness.

Write a short runbook: how to rotate keys, how to drain the queue, how to roll back the last ingest.

Before promoting the stack, freeze versions, capture a golden transcript for the critical path, and confirm rollback steps. Shared environments need rate limits, tenancy checks, and a clear owner for secret rotation. Prefer boring reliability over clever one-off demos.

Batch note for 8d0c322cbcd1: keep provider keys out of the repo, set a per-session token ceiling, and store transcripts next to the eval fixtures so later model swaps stay comparable.

The hardening note 0 stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Treat this stage as a contract between inputs and validated outputs. Name the artifacts, define success checks, and refuse silent partial completion.

Hardening detail 0/899: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.

For the hardening note 1 stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Keep configuration outside application code. Environment files, secret stores, and feature flags belong in one place operators can audit without reading the whole graph.

Hardening detail 1/899: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.

When working through the hardening note 2 stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Prefer small, testable units over sprawling scripts. When a step fails, the failure should point at a single responsibility rather than a tangled pipeline.

Hardening detail 2/899: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.

The hardening note 3 stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Record timings and token or query cost next to functional results. Cost visibility early prevents surprise bills when the path moves from demo to shared environments.

Hardening detail 3/899: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.

For the hardening note 4 stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Document the happy path and the recovery path together. Retries, human gates, and dead-letter handling are part of the product, not later polish.

Hardening detail 4/899: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.

When working through the hardening note 5 stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Treat this stage as a contract between inputs and validated outputs. Name the artifacts, define success checks, and refuse silent partial completion.

Hardening detail 5/899: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.

The hardening note 6 stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Keep configuration outside application code. Environment files, secret stores, and feature flags belong in one place operators can audit without reading the whole graph.

Hardening detail 6/899: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.

For the hardening note 7 stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Prefer small, testable units over sprawling scripts. When a step fails, the failure should point at a single responsibility rather than a tangled pipeline.

Hardening detail 7/899: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.

When working through the hardening note 8 stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Record timings and token or query cost next to functional results. Cost visibility early prevents surprise bills when the path moves from demo to shared environments.

Hardening detail 8/899: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.

The hardening note 9 stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Document the happy path and the recovery path together. Retries, human gates, and dead-letter handling are part of the product, not later polish.

Hardening detail 9/899: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.