Home / Articles / Practical notes: What building agents taught me about production engineering

This article is published in English.

Practical notes: What building agents taught me about production engineering

Operable walkthrough of Practical notes: What building agents taught me about production engineering: contracts, checks, and drop-in code slots for teams shipping this pattern.

1653 words

The following notes reconstruct a practical path around “What building agents taught me about production engineering”. Emphasis stays on contracts, checks, and drop-in code placeholders rather than motivational framing. When working through the Overview stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Keep configuration outside application code. Environment files, secret stores, and feature flags belong in one place operators can audit without reading the whole graph.

Define completion before choosing a framework

The Define completion before choosing stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Document the happy path and the recovery path together. Retries, human gates, and dead-letter handling are part of the product, not later polish. Keep graph state flat and typed. Nested blobs hide which node wrote which field and break resume after interrupts.

Make state describe what actually happened

The Make state describe what stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Prefer small, testable units over sprawling scripts. When a step fails, the failure should point at a single responsibility rather than a tangled pipeline. Keep graph state flat and typed. Nested blobs hide which node wrote which field and break resume after interrupts.

Give each run one logical owner

The Give each run one stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Treat this stage as a contract between inputs and validated outputs. Name the artifacts, define success checks, and refuse silent partial completion. Keep graph state flat and typed. Nested blobs hide which node wrote which field and break resume after interrupts. The Give each run one stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Keep configuration outside application code. Environment files, secret stores, and feature flags belong in one place operators can audit without reading the whole graph.

Make context specific to the job

For the Make context specific to stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Document the happy path and the recovery path together. Retries, human gates, and dead-letter handling are part of the product, not later polish. Put human approval on edges that spend money or change production data. Compile-time wiring does not equal business completeness.

Treat external actions as a separate execution problem

For the Treat external actions as stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Prefer small, testable units over sprawling scripts. When a step fails, the failure should point at a single responsibility rather than a tangled pipeline. Put human approval on edges that spend money or change production data. Compile-time wiring does not equal business completeness.

Measure the workflow at its boundaries

For the Measure the workflow at stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Treat this stage as a contract between inputs and validated outputs. Name the artifacts, define success checks, and refuse silent partial completion. Put human approval on edges that spend money or change production data. Compile-time wiring does not equal business completeness. For the Measure the workflow at stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Keep configuration outside application code. Environment files, secret stores, and feature flags belong in one place operators can audit without reading the whole graph.

Release the behavior together

When working through the Release the behavior together stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Document the happy path and the recovery path together. Retries, human gates, and dead-letter handling are part of the product, not later polish. Checkpoint after expensive steps. Resume should not re-bill the same LLM call when an operator retries a later node.

Stay with one workflow long enough to learn

When working through the Stay with one workflow stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Prefer small, testable units over sprawling scripts. When a step fails, the failure should point at a single responsibility rather than a tangled pipeline. Checkpoint after expensive steps. Resume should not re-bill the same LLM call when an operator retries a later node.

Operational checklist

For the Operational checklist stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state.

Record timings and token or query cost next to functional results. Cost visibility early prevents surprise bills when the path moves from demo to shared environments.

Put human approval on edges that spend money or change production data. Compile-time wiring does not equal business completeness.

Write a short runbook: how to rotate keys, how to drain the queue, how to roll back the last ingest.

Keep configuration outside application code. Environment files, secret stores, and feature flags belong in one place operators can audit without reading the whole graph.

Put human approval on edges that spend money or change production data. Compile-time wiring does not equal business completeness.

Before promoting the stack, freeze versions, capture a golden transcript for the critical path, and confirm rollback steps. Shared environments need rate limits, tenancy checks, and a clear owner for secret rotation. Prefer boring reliability over clever one-off demos.

Batch note for a3b715e66fb4: keep provider keys out of the repo, set a per-session token ceiling, and store transcripts next to the eval fixtures so later model swaps stay comparable.

For the hardening note 0 stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Treat this stage as a contract between inputs and validated outputs. Name the artifacts, define success checks, and refuse silent partial completion.

Hardening detail 0/864: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.

When working through the hardening note 1 stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Keep configuration outside application code. Environment files, secret stores, and feature flags belong in one place operators can audit without reading the whole graph.

Hardening detail 1/864: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.

The hardening note 2 stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Prefer small, testable units over sprawling scripts. When a step fails, the failure should point at a single responsibility rather than a tangled pipeline.

Hardening detail 2/864: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.

For the hardening note 3 stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Record timings and token or query cost next to functional results. Cost visibility early prevents surprise bills when the path moves from demo to shared environments.

Hardening detail 3/864: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.

When working through the hardening note 4 stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Document the happy path and the recovery path together. Retries, human gates, and dead-letter handling are part of the product, not later polish.

Hardening detail 4/864: measure wall time, error class, and token spend for this note, then decide whether to keep the change based on a fixed question set rather than anecdote.