This article is published in English.
Practical notes: Why Your Agent Passes Every Eval and Still Fails in Production
Operable walkthrough of Practical notes: Why Your Agent Passes Every Eval and Still Fails in Production: contracts, checks, and drop-in code slots for teams shipping this pattern.
The following notes reconstruct a practical path around “Why Your Agent Passes Every Eval and Still Fails in Production”. Emphasis stays on contracts, checks, and drop-in code placeholders rather than motivational framing. When working through the Overview stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Treat this stage as a contract between inputs and validated outputs. Name the artifacts, define success checks, and refuse silent partial completion.
Why the eval set ages the day it ships
The Why the eval set stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Record timings and token or query cost next to functional results. Cost visibility early prevents surprise bills when the path moves from demo to shared environments. Keep graph state flat and typed. Nested blobs hide which node wrote which field and break resume after interrupts.
Drift 1: dataset drift
The Drift 1 dataset drift stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Keep configuration outside application code. Environment files, secret stores, and feature flags belong in one place operators can audit without reading the whole graph. Keep graph state flat and typed. Nested blobs hide which node wrote which field and break resume after interrupts.
Drift 2: tool-API drift
The Drift 2 tool-API drift stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Document the happy path and the recovery path together. Retries, human gates, and dead-letter handling are part of the product, not later polish. Expose tools with narrow schemas and explicit side-effect labels. Hosts need to know which calls mutate state before they auto-approve. The Drift 2 tool-API drift stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Treat this stage as a contract between inputs and validated outputs. Name the artifacts, define success checks, and refuse silent partial completion.
Drift 3: prompt drift
For the Drift 3 prompt drift stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Record timings and token or query cost next to functional results. Cost visibility early prevents surprise bills when the path moves from demo to shared environments. Prefer structured outputs with schema validation over free-form prose when the next step is code or a tool call.
Drift 4: retrieval-corpus drift
For the Drift 4 retrieval-corpus drift stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Keep configuration outside application code. Environment files, secret stores, and feature flags belong in one place operators can audit without reading the whole graph. Cite the passages that actually grounded the answer. Without citations, operators cannot tell hallucination from an indexing gap.
Drift 5: user-distribution drift
For the Drift 5 user-distribution drift stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Document the happy path and the recovery path together. Retries, human gates, and dead-letter handling are part of the product, not later polish. Put human approval on edges that spend money or change production data. Compile-time wiring does not equal business completeness. For the Drift 5 user-distribution drift stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state. Treat this stage as a contract between inputs and validated outputs. Name the artifacts, define success checks, and refuse silent partial completion.
Drift 6: agent-step compounding
When working through the Drift 6 agent-step compounding stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Record timings and token or query cost next to functional results. Cost visibility early prevents surprise bills when the path moves from demo to shared environments. Checkpoint after expensive steps. Resume should not re-bill the same LLM call when an operator retries a later node.
Why more offline evals cannot fix this
When working through the Why more offline evals stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Keep configuration outside application code. Environment files, secret stores, and feature flags belong in one place operators can audit without reading the whole graph. Checkpoint after expensive steps. Resume should not re-bill the same LLM call when an operator retries a later node.
Score the trace on four axes, not one
When working through the Score the trace on stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Document the happy path and the recovery path together. Retries, human gates, and dead-letter handling are part of the product, not later polish. Checkpoint after expensive steps. Resume should not re-bill the same LLM call when an operator retries a later node. When working through the Score the trace on stage, write down the contract first: required inputs, success signal, and what happens on partial failure. That checklist keeps later code changes honest. Treat this stage as a contract between inputs and validated outputs. Name the artifacts, define success checks, and refuse silent partial completion.
The promote-back loop
The The promote-back loop stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Record timings and token or query cost next to functional results. Cost visibility early prevents surprise bills when the path moves from demo to shared environments. Keep graph state flat and typed. Nested blobs hide which node wrote which field and break resume after interrupts.
Three tradeoffs you made on purpose
The Three tradeoffs you made stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Keep configuration outside application code. Environment files, secret stores, and feature flags belong in one place operators can audit without reading the whole graph. Keep graph state flat and typed. Nested blobs hide which node wrote which field and break resume after interrupts.
What this comes down to
The What this comes down stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Document the happy path and the recovery path together. Retries, human gates, and dead-letter handling are part of the product, not later polish. Keep graph state flat and typed. Nested blobs hide which node wrote which field and break resume after interrupts. The What this comes down stage works best when treated as a measurable surface. Capture one golden transcript, one failure case, and the rollback note before expanding scope. Treat this stage as a contract between inputs and validated outputs. Name the artifacts, define success checks, and refuse silent partial completion.
Operational checklist
For the Operational checklist stage, define the inputs, the owner of the step, and the exit criteria before changing code. Operators should be able to re-run the step from a known checkpoint without guessing hidden state.
Prefer small, testable units over sprawling scripts. When a step fails, the failure should point at a single responsibility rather than a tangled pipeline.
Put human approval on edges that spend money or change production data. Compile-time wiring does not equal business completeness.
Track cost and latency beside quality. A slightly worse answer that costs 10x less may be the right production trade.
Pin dependency versions and record the image digest that ran the demo. Reproducibility beats tribal knowledge.
Keep configuration outside application code. Environment files, secret stores, and feature flags belong in one place operators can audit without reading the whole graph.
Before promoting the stack, freeze versions, capture a golden transcript for the critical path, and confirm rollback steps. Shared environments need rate limits, tenancy checks, and a clear owner for secret rotation. Prefer boring reliability over clever one-off demos.
Batch note for d826c5986cfd: keep provider keys out of the repo, set a per-session token ceiling, and store transcripts next to the eval fixtures so later model swaps stay comparable.